    Work Done From 4th October 2007 to 18th January 2008

    Day 1 - Thursday 4th October 2007

          Took off trim

          Removed all glass

          Removed bonnet, doors and boot

     

    Day 2 - Saturday 6th October 2007

          Removed rear lights, petrol tank, 1 headlight and 1 side light and engine manifolds

          Brought 1 cylinder of gas, welding wire, nozzles, anti-spatter spray, grinding and cutting/sanding discs

     

    Day 3 - Sunday 7th October 2007

          Took off wheels

          Started to labelled wiring loom

          Removed starter, dynamo and soaked all of the sub-frame bolts in WD40

     

    Day 4 - Friday 12th October 2007

          Jacked up car

          Dropped sub-frame and engine onto floor using trolley jack

          Jacked up car further and pulled engine and sub-frame forward

     

    Day 5 - Saturday 13th October 2007

          Took out the rear sub-frame

     

    Day 6 - Sunday 14th October 2007

          Stripped rear sub-frame ready for blasting and powder coating

     

    Day 7 - Tuesday 16th October 2007

          Removed engine from sub-frame

          Removed suspension from front sub-frame

          Straightened bent cross members of both sub-frames

          Both sub-frames are in good conditions

          Masked all threads and bearing surfaces ready for blasting prior to powder coating

     

    Thursday 18th October 2007

          Took sub-frames to Bownes of Bissell Street for steam cleaning, blasting and powder coating

     

    Day 8 - Saturday 20th October 2007

          Removed clutch housing from engine, clutch plate and flywheel nut

          Awaiting delivery of special puller to remove fly wheel

          Removed front engine pulley, timing chain cover, crank shaft and crank shaft sprockets complete with timing chain

          Timing chain and tensioner rubbers need to be replaced

          Drained engine oil

     

    Day 9 - Saturday 27th October 2007

          Split engine and gearbox

          Removed crank shaft con-rods and pistons

          Bores and pistons are good but rings need replacing

          Slight wear on big ends, main bearings good

     

    Day 10 - Sunday 28th October 2007

          Removed break drums from back plates

          Skimmed drums in lathe

          Cleaned engine and gearbox

          Stripped cylinder head

     

    Day 11 - Sunday 4th November 2007

          Removed and labelled wiring loom from engine bay

          Took out brake master cylinder

          Loosened clutch master cylinder

     

    Day 12 - Tuesday 6th November 2007

          Collected cylinder head from Stirchley (refaced)

          Removed speedometer

          Labelled up more wiring loom

          Fitted jig to front of car

     

    Friday 9th November

          Re-faced exhaust valves seats. Ground in 8 valves

          Brought head gasket set and engine bearings

     

    Day 13 - Saturday 10th November 2007

          Refitted valves and springs to cylinder head

          Completely removed front wiring loom

          Cut off front wings

          Removed left hand front shock absorber

     

    Day 14 - Sunday 11th November 2007

          Fitted new rings to pistons and new engine bearings

          Assembled pistons in block and fitted crankshaft

          Fitted cam shaft

          Prepared front of car for welding repairs

          Removed front side indicator assemblies

          Ground off remains of old front wings and prepared surfaces for welding

     

    Day 15 - Tuesday 20th November 2007

          Removed steering column, rack and pinion

          Cut out rusted metal from back of front wheel arches

     

    Day 16 - Thursday 22nd November 2007

          Trimmed back edges of front panels ready for welding on new wings which are on order

     

    Day 17 - Tuesday 27th November 2007

          Removed back bumper

          Repaired inner wing arch on drivers side

     

    Day 18 - Thursday 29th November 2007

          Mounted car on ‘swing jig’

     

    Day 19 - Friday 30th November 2007

          Removed drivers shock absorber bracket and repaired end of bulkhead cross member

          Repaired shock absorber bracket which was very corroded

          New panels arrived

          Treated inner wing arch with phosphoric acid in treat rust

     

    Day 20 - Monday 3rd December 2007

          Refitted drivers side shock absorber bracket

          Sprayed inner wing arch with hammerite

          Repaired top of bulkhead

     

    Day 21 - Tuesday 4th December 2007

          Removed head lining

          Continued welding bulkhead

     

    Day 22 - Tuesday 11th December 2007

          Removed drivers side A panel

          Cut out drivers side step panel

          Cut out corroded metal from door pillar

     

    Day 23 - Wednesday 12th December 2007

          Trial fitting of new A panel

          Make up repair strips for door pillar and welded into place

          Brought new step panels

     

    Day 24 - Saturday 15th December 2007

          Hang driver’s door to correctly fit A panel.

          Weld panels into place

          Sand off bottom of drivers door and treat with phosphoric acid

          Repair and paint scultel top panel

          Start to repair edge of corroded front panel

     

    Day 25 - Sunday 16th December 2007

          Removed drivers door

          Cut off drivers side step panel and bottom of rear body panel

          Trimmed flange on floor panel prior to welding (step panel)

     

    Day 26 - Tuesday 18th December 2007

          Started welding drivers side floor cross member (corroded in sill)

          De-rusted interior of sill

          Began fitting drivers side step panel

          Rust treated inner wheel arch (drivers side)

     

    Day 27 - Saturday 22nd December 2007

          Finished welding drivers side step panel

          Repaired body panel behind drivers side rear glovebox

     

    Day 28 - Monday 14th January 2008

          Started to Repair top edge of front panel – drivers side

     

    Day 29 - Tuesday 15th January 2008

          Finished repairing front panel – drivers side

          Test fitted front wing on drivers side – slight adjustment needed prior to welding the front wing onto the car

     

    Day 30 - Friday 18th January 2008

          Cut off nearside ‘A’ panels

          Cut out all rusted metal from inner wing area

          Rust proofed all welded work on offside of car

          Welded in patch on shock absorber bracket.

    Work Done From 21st January 2008 to 19th April 2008

    Day 31 - Monday 21st January 2008

          De-rusted engine bay

          Began repairing nearside wheel arch

          Cut off nearside sill top and cleaned out

          Began repairing near side inner sill brace

     

    Day 32 - Tuesday 22nd January 2008

          Painted engine bay with undercoat

          Treated nearside inner wheel arch with phosphoric acid

          Painted offside front panel with Hammerite

          Started welding nearside inner wheel arch

          Fitted nearside top shock absorber bracket

     

    Day 33 - Saturday 26th January 2008

          Continued to weld inner wheel arch on near side

          Finished welding near side inner sill brace

     

    Day 34 - Sunday 27th January 2008

          Repaired front end of nearside sill (welded new metal)

          Finished welding nearside inner wheel arch

          Repaired nearside top scuttle panel by welding new metal in

          Trial fitted nearside front wing – slight adjustment needed

     

    Day 35 - Tuesday 29th January 2008

          Finished welding nearside inner wheel arch

          Fitted nearside A panels

          Cut new nearside sill top to fit in 2 new parts

          Trial fitted nearside front wing – slight adjustment needed

     

    Day 36 - Thursday 31st January 2008

          Welded nearside top sill panel

          Welded new metal into base of radiator cowl

          Painted nearside inner wing arch and engine bay with primer

     

    Day 37 - Friday 1st February 2008

          Repaired top of nearside front panel

          Welded 2nd half of nearside top sill

          Reinforced engine steady bracket with fillets

     

    Day 38 - Sunday 3rd February 2008

          Painted inner wheel arches and engine bay in primer

          Repaired metal around gear lever hole

     

    Day 39 - Monday 4th February 2008

          Repaired front edge of door frame on drivers side

          Joined offside floor edge at front to inner wheel arch and painted with primer

     

    Day 40 - Tuesday 5th February 2008

          Fitted both front wings and started to weld into place

     

    Day 41 - Wednesday 6th February 2008

          Finished welding nearside front wing

     

    Day 42 - Friday 8th February 2008

          Started to cut away back panel under boot

          Removed supports for boot floor to expose corrosion

     

    Day 43 - Saturday 16th February 2008

          Supported car under the rear wheel arch so the rear body jig could be removed

          Cut off rest of back panel

     

    Day 44 – Monday 18th February 2008

          Blended off-side ‘A’ panel into sill step

          Cut out corroded metal from offside of boot bottom

          Blended in rear side panel into off-side sill panel

     

    Day 45 – Tuesday 19th February 2008

          Repaired off-side rear body panel at bottom

          Rebuilt corroded metal under off-side rear bumper

          Began repairing boot floor

    o       WELDER BROKE DOWN

     

    Friday 22nd February 2008

          Collected welders from repairers – dry joints in printed circuit board

     

    Day 46 – Sunday 24th February 2008

          Continued repairing boot floor (cut out corroded metal and welded in new)

     

    Day 47 – Monday 25th February 2008

          Welded rear end of off-side wheel arch

          Started repairing near-side boot floor (cut out corroded metal and welded in new)

     

    Day 48 – Tuesday 26th February 2008

          Finished welding near-side boot floor and wheel arch

          Wire brushed complete rear-end prior to fitting new rear panel

          New rear panel adjusted to fit body

          Fitted off-side end to rear panel and welded to wheel arch

     

    Day 49 – Friday 29th February 2008

          Fitted near-side end to rear panel and welded to wheel arch

          Drilled holes in rear-end of body to spot weld rear panel onto it

          Refitted rear jig in preparation for tilting the car 90˚ to de-rust and paint underside of car

     

    Day 50 – Sunday 2nd March 2008

          Tilted car 90˚ on jig to start working on the underside on Monday

     

    Day 51 – Monday 3rd March 2008

          Wire brushed nearside sill and floor area

          Treated with phosphoric acid

          Cut out corroded metal in rear nearside quarter panel

          Spot welded new metal to bottom and rear of nearside quarter panel

          Primed treated areas with hammerite

     

    Day 52 – Tuesday 4th march 2008

          Wire brushed nearside rear wheel arch

          Repaired rear shock absorber mounting

          Finished welding repair patches to nearside of boot floor

          Treated wheel arch with phosphoric acid

          Sprayed wheel arch with primer

     

    Day 53 – Thursday 6th March 2008

          Tilted car opposite way (offside up)

          Repaired shock absorber mounting

          Wire brushed floor and sill

          Cut out and repaired corroded metal

     

    Day 54 – Monday 10th March 2008

          Welded nearside front wind to front panel

          Wire brushed, de rusted and primed off-side rear wheel arch

          First coat of primer put on under floor area

     

    Day 55 – Tuesday 11th March 2008

          Repaired battery carrier, and offside rear seat panel

          Wire brushed and acid treated panel area under rear bumper

          Wire brushed and vacuumed out boot floor prior to acid treatment

          Acid treated boot floor

     

    Day 56 – Thursday 13th March 2008

          Wire brushed offside sill and under floor area

          Acid treated and repaired pin holes and sprayed with primer

     

    Day 57 – Friday 14th March 2008

          Sealed all welds on offside with seam sealer

          Repaired edge of front panel and joined to off-side of front wing

     

    Day 58 – Monday 24th March 2008

          Sprayed underside of car in red primer

          Seam sealed nearside

          Applied red primer to areas not previously sprayed

     

    Day 59 – Tuesday 25th March 2008

          Applied filler to repaired areas

          Sprayed underside with ‘stone-chip’

     

    Day 60 – Thursday 27th March 2008

          Painted boot floor with ‘chassis black

          Sprayed ‘chassis black’ on inside of the front wings and front panel

     

    Day 61 – Wednesday 2nd April 2008

          Applied second coat of ‘stone-chip’ to underside of car

          Started to reassemble rear subframe

     

    Day 62 – Friday 4th April 2008

          Pressed in new bushes to both radius arms

          Reamed plain bush in each arm to fit mounting spindle.

     

    Day 63 – Monday 7th April 2008

          Cleaned and painted rear suspension units and fitted to the rear sub-frame

          Fitted sub-frame Assembly to the car after treating sub-frame with “Di-nitrol”

          Fitted flexible brake hoses and rear shock absorber to nearside

     

    Day 64 – Tuesday 8th April 2008

          Fitted offside rear shock absorber and restored back plates

          Fitted hydraulic cylinders to back plates and brake shoes to the offside

          Sprayed steering rack in primer

     

    Day 65 – Wednesday 9th April 2008

          Made up and fitted copper brake pipe to rear brakes

     

    Day 66 – Thursday 10th April 2008

          Fitted steering rack

          Took gearbox to home workshop to dismantle

          Starting painting engine block

     

    Day 67 – Friday 11th April 2008

          Started to dismantle gearbox

          Took of differential unit and outer main shaft bearing

     

    Thursday 17th April 2008

          Collected riley elf cylinder head from being resurfaced (restored hornet cylinder head fitted to my Mum’s 69 Elf as this was distorted from overheating)

     

    Day 68 – Friday 18th April 2008

          Still working in home workshop

          Ground in valves

          Refitted Elf cylinder head to Hornet engine

          Finished painting engine block and cylinder head in white primer / orange undercoat / BMC engine green overcoat

     

     Day 69 – Saturday 19th April 2008

          Finished stripping gearbox (centre main shaft bearing in very poor state)

          Pressure cleaned gearbox housing and bell housing

          Masked off gearbox housing and bell housing and painted

          Mounted rear brake drum in Lathe ready for skimming

     

    Work Done From 21st April to 28th June 2008

    Day 70 – Monday 21st April 2008

          Cleaned and checked inside of gearbox

          Cleaned and inspected main-shaft and lay-shaft

          Sourced new gearbox bearings and differential bearings

     

    Day 71 – Tuesday 22nd April 2008

          Dismantled main-shaft and inspected synchro-mesh cones – ok

     

    Day 72 – Friday 25th April 2008

          Applied first coat of paint to engine bay – BMC TARTAN RED

          Also painted offside sill

          Trial fitting of off-side rear brake drum. All drums require skimming

          Car inspected by paint sprayer to get quote

     

    Day 73 – Sunday 27th April 2008

          Skimmed all 4 brake drums removing approximately 10 thou. from each

          Made up new spindles for handbrake cable attachment to rear radius arms

     

    Day 74 – Monday 28th April 2008

          Applied 2nd coat of red to engine bay. Problem with reaction to previous coat

          Flatted down with 120 and 240 paper prior to applying barrier coat

     

    Day 75 – Tuesday 29th April 2008

          Sprayed top coat to boot – same problem as with engine bay

          Flatted down ready for barrier coat

          Experimented with aerosol lacquer – not successful

     

    Thursday 30th April 2008

          Picked up gearbox bearings from supplier

     

    Day 76 – Thursday 1st May 2008

          Sprayed engine bay and boot space with barrier paint to prevent reaction with top coat

     

    Day 77 – Friday 2nd May 2008

          Applied top coat to engine bay and boot space (this will be lightly flatted prior to spraying with clear lacquer)

          Carried on rebuilding gearbox with new bearings

          Fitted main-shaft, followed by lay shaft

          Checked gear engagement before fitting pinion. All gears engaged except neutral.

     

    Day 78 – Saturday 3rd May 2008

          Unable to get neutral because of sticking synchro-cones. Lubricated generously and all well

          Fitted pinion, selector gate and gear change rod

          Fitted new carrier bearings to differential unit and fitted to gearbox with new gaskets

          Adjusted crown wheel/pinion mesh with shims to give correct engagement backlash

     

    Day 79 – Tuesday 6th May 2008

          Transported engine from workshop to Wolseley’s garage

          Loaded engine onto small trolley for ease of moving around

     

    Day 80 – Friday 9th May 2008

          Fitted engine to sub-frame with new mountings

     

    Day 81 – Saturday 10th May 2008

          Fitted new brake cable quadrants to rear radius arms with new pins

          Fitted split pins to drive shaft couplings after torquing up

          Fitted suspension and drive shafts to engine and sub-frame

     

    Day 82 – Monday 12th May 2008

          Fitted radiator fan and fan belt

     

    Day 83 – Tuesday 13th May 2008

          Fitted radiator and hoses

          Painted bulkhead with final coat of stone-chip and sprayed with di-nitrol.

     

    Day 84 – Thursday 15th May 2008

    o   PROBLEM – How do you fit the engine without a hoist?

    o   ANSWER  -Fit the car to the engine

          Put engine and sub-frame onto trolley

          Pushed engine and sub-frame assembly under car using the trolley

          Carefully lowered the car using 2 trolley jacks over engine and sub-frame

     

    Day 85 – Friday 16th May 2008

          Fitted rear wheels and supported car on ramps

          Removed rear body jig

          Supported front of floor on tyres and removed front jig

          Carefully jacked the sub-frame the last 2” and aligned bolt holes – alignment perfect despite much welding

          Fitted front off-side shock absorber and radius arm bracing arms with new rubbers

     

    Day 86 – Thursday 22nd May 2008

          Painted solenoid, mounting plate and distributor mounting

          Made up leather gasket to fit underneath brake and clutch master cylinders

          Removed masking paper from wings

     

    Day 87 – Friday 23rd May 2008

          Fitted new brake master cylinder and old clutch cylinder

          Fitted pressure valve to rear brake pipes

          Fitted new clutch slave cylinder

          Began making new front copper brake pipes

          Temporally fitted front wheels to support car

     

    Day 88 – Tuesday 27th May 2008

          Fitted new front brake pipes and off-side front brake shoes

          Fitted exhaust with new mounts and clamps

     

    Day 89 – Wednesday 28th May 2008

          Fitted nearside brake shoes.

          Made up gasket and fitted distributor carrier

          Fitted solenoid and bracket.

     

    Day 90 – Tuesday 3rd June 2008

          Fitted nearside front shock absorber

          Attached cables to handbrake

          Drilled out body trim clips

          Cleaned interior of car and rubbed down prior to painting

          Applied seam sealer to front bumper mountings, and to previous internal welds

          Started to mask up ready for interior spraying

          Painted bottom of front panel with tannic and rust treatment

     

    Day 91 – Wednesday 4th June 2008

          Finished masking ready for interior spraying

          Sprayed isolator to front and rear interior

          Sprayed stone-chip to bottom of front panel

     

    Day 92 – Thursday 5th June 2008

          Blew out and vacuumed interior

          Dry sanded isolator

          Sprayed interior in beige undercoat (2-pack)

       Sprayed interior with TARTAN RED – 90% complete

     

    Day 93 – Friday 6th June 2008

          Removed front grille from bonnet

          Removed chrome trim from doors

          These items to be taken to platers to re-chrome stripping, polishing and re-plating.

     

    Monday 9th June 2008

          Removed tyres from wheels (local tyre service)

          Took them for shot blasting and powder coating

          Took chrome work to platers for chrome stripping prior to polishing

     

    Tuesday 10th June 2008

          Collected wheels from blasters

     

    Day 94 – Wednesday 11th June 2008

          Stripped paint from bonnet back to bare metal

          Cleaned and repaired water channels under the door windows with fibreglass resin (heavily Corroded)

          Treated bonnet with tanic acid prior to painting.

     

    Day 95 – Thursday 12th June 2008

          Removed defective filler from off-side rear panel

          Bled brake system

          Fitted new tyres to wheels and then fitted them to car

     

    Day 96 – Friday 13th June 2008

          Continued to repair door water channels

          Welded repair patch to front edge of bonnet

          Small welding repairs to door channels

     

    Day 97 – Monday 16th June 2008

          Final resin repair to door channels

          Surplus resin used on boot floor to seal any porous welds

          Repaired corrosion in door bottoms after de-rusting and treating with tanic acid.

          Sprayed bonnet in primer

     

    Day 98 – Tuesday 17th June 2008

          Fitted engine stay with new brushes

          Rubbed down doors

          Rubbed down primer on bonnet

     

    Day 99 – Thursday 19th June 2008

          Dismantled starter

          Fitted new brushes and Bendix spring

          Cleaned, treated and painted starter in top coat

          Began fitting new wiring loom

     

    Day 100 – Friday 20th June 2008

          Fitted regulator box and fuse box, starter motor, flasher unit and speedometer

     

     

    Day 101 – Friday 27th June 2008

          Fitted clutch hydraulics

     

    Day 102 – Saturday 28th June 2008

          Cleaned an treated heater unit

          Bled clutch

          Fitted battery for circuit testing

          Fitted HT cable from battery to starter

    Work Done From 30th June to Now

    Day 103 – Monday 30th June 2008

          Fitted new heater hose, horn and petrol line

     

    Day 104 – Tuesday 1st July 2008

          Fitted ignition switch, dip switch and light switch

          Painted heater unit in black

     

    Day 105 - Wednesday 2nd July 2008

          THE BIG DAY – Starting the engine

          Engine fired first – needed ignition advancing to run smoothly. Good oil pressure.

     

    Day 106 – Thursday 3rd July 2008

          Painted steering column

          Carried on fitting wiring loom

          Rubbed down interior

          Painted heater pipe covers and petrol tank straps in primer

     

    Day 107 – Friday 4th July 2008

          Rubbed down interior and sprayed it again

          Started fitting dashboard trim (lower)

     

    Day 108 – Monday 7th July 2008

          Fitted steering column

     

    Day 109 – Tuesday 8th July 2008

          Fitted sound proofing to the front bulkhead

          Fitted ignition switch and window wiper switch

     

    Day 110 – Wednesday 9th July 2008

          Fitted heater

          Fitted heater control

          Fitted carpet to the front bulkhead

          Fitted bonnet pull

     

    Day 110 – Thursday 10th July 2008

          Fitted headlight switch

          Fitted petrol pump in boot for ease of access.

          Fitted petrol tank and straps

          Painted off-side boot floor support panel in primer

     

     Day 111 – Friday 11th July 2008

          Painted boot support panel in black

          Cut out new sound proof material for bulkhead above parcel shelf

     

    Day 112 – Monday 14th July 2008

          Fitted offside boot support panel

          Fitted window screen wiper motor and assembly

          Ran engine to check water temperature – Adjusted carburettor float level

          Fitted sound proofing to upper bulkhead

          Started to fit trim to the upper dashboard and fitted the near-side screen vent

     

    Day 113 – Tuesday 15th July 2008

          Fitted near side heater pipe to vent

     

    Day 114 – Friday 18th July 2008

          Filled off-side rear quarter panel

          Started to fill door bottoms

          Filled depressions in bonnet

          Removed rust from underneath of offside waist line trim and treated with tanic acid

          Continued flatting filler

          Removed number plate and badges from boot lid

     

    Day 115 – Monday 21st July 2008

          Rubbed down paint of boot lid

          Continued to rub down body and doors

     

    Day 116 – Wednesday 23rd July 2008

          Continued to rub down doors

          Flatted filler on bonnet and built up where needed

     

    Day 117 – Thursday 24th July 2008

          Continued to rub down and build up filler

     

    Day 118 – Friday 25th July 2008

          Continued flatting and filling

     

    Day 119 – Tuesday 29th July 2008

          Continued flatting and filling

     

    Day 120 – Wednesday 30th July 2008

          Continued flatting and filling

     

    Day 121 – Thursday 31st July 2008

          Continued flatting and filling

     

    Day 122 – Friday 1st August 2008

          Continued flatting and filling

          Vacced out car for inspection by paint sprayer.