7月2日 Work Done From 4th October 2007 to 18th January 2008Day 1 - Thursday 4th October 2007 Took off trim Removed all glass Removed bonnet, doors and boot
Day 2 - Saturday 6th October 2007 Removed rear lights, petrol tank, 1 headlight and 1 side light and engine manifolds Brought 1 cylinder of gas, welding wire, nozzles, anti-spatter spray, grinding and cutting/sanding discs
Day 3 - Sunday 7th October 2007 Took off wheels Started to labelled wiring loom Removed starter, dynamo and soaked all of the sub-frame bolts in WD40
Day 4 - Friday 12th October 2007 Jacked up car Dropped sub-frame and engine onto floor using trolley jack Jacked up car further and pulled engine and sub-frame forward
Day 5 - Saturday 13th October 2007 Took out the rear sub-frame
Day 6 - Sunday 14th October 2007 Stripped rear sub-frame ready for blasting and powder coating
Day 7 - Tuesday 16th October 2007 Removed engine from sub-frame Removed suspension from front sub-frame Straightened bent cross members of both sub-frames Both sub-frames are in good conditions Masked all threads and bearing surfaces ready for blasting prior to powder coating
Thursday 18th October 2007 Took sub-frames to Bownes of Bissell Street for steam cleaning, blasting and powder coating
Day 8 - Saturday 20th October 2007 Removed clutch housing from engine, clutch plate and flywheel nut Awaiting delivery of special puller to remove fly wheel Removed front engine pulley, timing chain cover, crank shaft and crank shaft sprockets complete with timing chain Timing chain and tensioner rubbers need to be replaced Drained engine oil
Day 9 - Saturday 27th October 2007 Split engine and gearbox Removed crank shaft con-rods and pistons Bores and pistons are good but rings need replacing Slight wear on big ends, main bearings good
Day 10 - Sunday 28th October 2007 Removed break drums from back plates Skimmed drums in lathe Cleaned engine and gearbox Stripped cylinder head
Day 11 - Sunday 4th November 2007 Removed and labelled wiring loom from engine bay Took out brake master cylinder Loosened clutch master cylinder
Day 12 - Tuesday 6th November 2007 Collected cylinder head from Stirchley (refaced) Removed speedometer Labelled up more wiring loom Fitted jig to front of car
Friday 9th November Re-faced exhaust valves seats. Ground in 8 valves Brought head gasket set and engine bearings
Day 13 - Saturday 10th November 2007 Refitted valves and springs to cylinder head Completely removed front wiring loom Cut off front wings Removed left hand front shock absorber
Day 14 - Sunday 11th November 2007 Fitted new rings to pistons and new engine bearings Assembled pistons in block and fitted crankshaft Fitted cam shaft Prepared front of car for welding repairs Removed front side indicator assemblies Ground off remains of old front wings and prepared surfaces for welding
Day 15 - Tuesday 20th November 2007 Removed steering column, rack and pinion Cut out rusted metal from back of front wheel arches
Day 16 - Thursday 22nd November 2007 Trimmed back edges of front panels ready for welding on new wings which are on order
Day 17 - Tuesday 27th November 2007 Removed back bumper Repaired inner wing arch on drivers side
Day 18 - Thursday 29th November 2007 Mounted car on ‘swing jig’
Day 19 - Friday 30th November 2007 Removed drivers shock absorber bracket and repaired end of bulkhead cross member Repaired shock absorber bracket which was very corroded New panels arrived Treated inner wing arch with phosphoric acid in treat rust
Day 20 - Monday 3rd December 2007 Refitted drivers side shock absorber bracket Sprayed inner wing arch with hammerite Repaired top of bulkhead
Day 21 - Tuesday 4th December 2007 Removed head lining Continued welding bulkhead
Day 22 - Tuesday 11th December 2007 Removed drivers side A panel Cut out drivers side step panel Cut out corroded metal from door pillar
Day 23 - Wednesday 12th December 2007 Trial fitting of new A panel Make up repair strips for door pillar and welded into place Brought new step panels
Day 24 - Saturday 15th December 2007 Hang driver’s door to correctly fit A panel. Weld panels into place Sand off bottom of drivers door and treat with phosphoric acid Repair and paint scultel top panel Start to repair edge of corroded front panel
Day 25 - Sunday 16th December 2007 Removed drivers door Cut off drivers side step panel and bottom of rear body panel Trimmed flange on floor panel prior to welding (step panel)
Day 26 - Tuesday 18th December 2007 Started welding drivers side floor cross member (corroded in sill) De-rusted interior of sill Began fitting drivers side step panel Rust treated inner wheel arch (drivers side)
Day 27 - Saturday 22nd December 2007 Finished welding drivers side step panel Repaired body panel behind drivers side rear glovebox
Day 28 - Monday 14th January 2008 Started to Repair top edge of front panel – drivers side
Day 29 - Tuesday 15th January 2008 Finished repairing front panel – drivers side Test fitted front wing on drivers side – slight adjustment needed prior to welding the front wing onto the car
Day 30 - Friday 18th January 2008 Cut off nearside ‘A’ panels Cut out all rusted metal from inner wing area Rust proofed all welded work on offside of car Welded in patch on shock absorber bracket. Work Done From 21st January 2008 to 19th April 2008Day 31 - Monday 21st January 2008 De-rusted engine bay Began repairing nearside wheel arch Cut off nearside sill top and cleaned out Began repairing near side inner sill brace
Day 32 - Tuesday 22nd January 2008 Painted engine bay with undercoat Treated nearside inner wheel arch with phosphoric acid Painted offside front panel with Hammerite Started welding nearside inner wheel arch Fitted nearside top shock absorber bracket
Day 33 - Saturday 26th January 2008 Continued to weld inner wheel arch on near side Finished welding near side inner sill brace
Day 34 - Sunday 27th January 2008 Repaired front end of nearside sill (welded new metal) Finished welding nearside inner wheel arch Repaired nearside top scuttle panel by welding new metal in Trial fitted nearside front wing – slight adjustment needed
Day 35 - Tuesday 29th January 2008 Finished welding nearside inner wheel arch Fitted nearside A panels Cut new nearside sill top to fit in 2 new parts Trial fitted nearside front wing – slight adjustment needed
Day 36 - Thursday 31st January 2008 Welded nearside top sill panel Welded new metal into base of radiator cowl Painted nearside inner wing arch and engine bay with primer
Day 37 - Friday 1st February 2008 Repaired top of nearside front panel Welded 2nd half of nearside top sill Reinforced engine steady bracket with fillets
Day 38 - Sunday 3rd February 2008 Painted inner wheel arches and engine bay in primer Repaired metal around gear lever hole
Day 39 - Monday 4th February 2008 Repaired front edge of door frame on drivers side Joined offside floor edge at front to inner wheel arch and painted with primer
Day 40 - Tuesday 5th February 2008 Fitted both front wings and started to weld into place
Day 41 - Wednesday 6th February 2008 Finished welding nearside front wing
Day 42 - Friday 8th February 2008 Started to cut away back panel under boot Removed supports for boot floor to expose corrosion
Day 43 - Saturday 16th February 2008 Supported car under the rear wheel arch so the rear body jig could be removed Cut off rest of back panel
Day 44 – Monday 18th February 2008
Blended off-side ‘A’ panel into sill step
Cut out corroded metal from offside of boot bottom
Blended in rear side panel into off-side sill panel
Day 45 – Tuesday 19th February 2008
Repaired off-side rear body panel at bottom
Rebuilt corroded metal under off-side rear bumper
Began repairing boot floor
o WELDER BROKE DOWN
Friday 22nd February 2008
Collected welders from repairers – dry joints in printed circuit board
Day 46 – Sunday 24th February 2008
Continued repairing boot floor (cut out corroded metal and welded in new)
Day 47 – Monday 25th February 2008
Welded rear end of off-side wheel arch
Started repairing near-side boot floor (cut out corroded metal and welded in new)
Day 48 – Tuesday 26th February 2008
Finished welding near-side boot floor and wheel arch
Wire brushed complete rear-end prior to fitting new rear panel
New rear panel adjusted to fit body
Fitted off-side end to rear panel and welded to wheel arch
Day 49 – Friday 29th February 2008
Fitted near-side end to rear panel and welded to wheel arch
Drilled holes in rear-end of body to spot weld rear panel onto it
Refitted rear jig in preparation for tilting the car 90˚ to de-rust and paint underside of car
Day 50 – Sunday 2nd March 2008
Tilted car 90˚ on jig to start working on the underside on Monday
Day 51 – Monday 3rd March 2008
Wire brushed nearside sill and floor area
Treated with phosphoric acid
Cut out corroded metal in rear nearside quarter panel
Spot welded new metal to bottom and rear of nearside quarter panel
Primed treated areas with hammerite
Day 52 – Tuesday 4th march 2008
Wire brushed nearside rear wheel arch
Repaired rear shock absorber mounting
Finished welding repair patches to nearside of boot floor
Treated wheel arch with phosphoric acid
Sprayed wheel arch with primer
Day 53 – Thursday 6th March 2008
Tilted car opposite way (offside up)
Repaired shock absorber mounting
Wire brushed floor and sill
Cut out and repaired corroded metal
Day 54 – Monday 10th March 2008
Welded nearside front wind to front panel
Wire brushed, de rusted and primed off-side rear wheel arch
First coat of primer put on under floor area
Day 55 – Tuesday 11th March 2008
Repaired battery carrier, and offside rear seat panel
Wire brushed and acid treated panel area under rear bumper
Wire brushed and vacuumed out boot floor prior to acid treatment
Acid treated boot floor
Day 56 – Thursday 13th March 2008
Wire brushed offside sill and under floor area
Acid treated and repaired pin holes and sprayed with primer
Day 57 – Friday 14th March 2008
Sealed all welds on offside with seam sealer
Repaired edge of front panel and joined to off-side of front wing
Day 58 – Monday 24th March 2008
Sprayed underside of car in red primer
Seam sealed nearside
Applied red primer to areas not previously sprayed
Day 59 – Tuesday 25th March 2008
Applied filler to repaired areas
Sprayed underside with ‘stone-chip’
Day 60 – Thursday 27th March 2008
Painted boot floor with ‘chassis black
Sprayed ‘chassis black’ on inside of the front wings and front panel
Day 61 – Wednesday 2nd April 2008
Applied second coat of ‘stone-chip’ to underside of car
Started to reassemble rear subframe
Day 62 – Friday 4th April 2008
Pressed in new bushes to both radius arms
Reamed plain bush in each arm to fit mounting spindle.
Day 63 – Monday 7th April 2008
Cleaned and painted rear suspension units and fitted to the rear sub-frame
Fitted sub-frame Assembly to the car after treating sub-frame with “Di-nitrol”
Fitted flexible brake hoses and rear shock absorber to nearside
Day 64 – Tuesday 8th April 2008
Fitted offside rear shock absorber and restored back plates
Fitted hydraulic cylinders to back plates and brake shoes to the offside
Sprayed steering rack in primer
Day 65 – Wednesday 9th April 2008
Made up and fitted copper brake pipe to rear brakes
Day 66 – Thursday 10th April 2008
Fitted steering rack
Took gearbox to home workshop to dismantle
Starting painting engine block
Day 67 – Friday 11th April 2008
Started to dismantle gearbox
Took of differential unit and outer main shaft bearing
Thursday 17th April 2008
Collected riley elf cylinder head from being resurfaced (restored hornet cylinder head fitted to my Mum’s 69 Elf as this was distorted from overheating)
Day 68 – Friday 18th April 2008
Still working in home workshop
Ground in valves
Refitted Elf cylinder head to Hornet engine
Finished painting engine block and cylinder head in white primer / orange undercoat / BMC engine green overcoat
Day 69 – Saturday 19th April 2008
Finished stripping gearbox (centre main shaft bearing in very poor state)
Pressure cleaned gearbox housing and bell housing
Masked off gearbox housing and bell housing and painted
Mounted rear brake drum in Lathe ready for skimming
Work Done From 21st April to 28th June 2008Day 70 – Monday 21st April 2008 Cleaned and checked inside of gearbox Cleaned and inspected main-shaft and lay-shaft Sourced new gearbox bearings and differential bearings
Day 71 – Tuesday 22nd April 2008 Dismantled main-shaft and inspected synchro-mesh cones – ok
Day 72 – Friday 25th April 2008 Applied first coat of paint to engine bay – BMC TARTAN RED Also painted offside sill Trial fitting of off-side rear brake drum. All drums require skimming Car inspected by paint sprayer to get quote
Day 73 – Sunday 27th April 2008 Skimmed all 4 brake drums removing approximately 10 thou. from each Made up new spindles for handbrake cable attachment to rear radius arms
Day 74 – Monday 28th April 2008 Applied 2nd coat of red to engine bay. Problem with reaction to previous coat Flatted down with 120 and 240 paper prior to applying barrier coat
Day 75 – Tuesday 29th April 2008 Sprayed top coat to boot – same problem as with engine bay Flatted down ready for barrier coat Experimented with aerosol lacquer – not successful
Thursday 30th April 2008 Picked up gearbox bearings from supplier
Day 76 – Thursday 1st May 2008 Sprayed engine bay and boot space with barrier paint to prevent reaction with top coat
Day 77 – Friday 2nd May 2008 Applied top coat to engine bay and boot space (this will be lightly flatted prior to spraying with clear lacquer) Carried on rebuilding gearbox with new bearings Fitted main-shaft, followed by lay shaft Checked gear engagement before fitting pinion. All gears engaged except neutral.
Day 78 – Saturday 3rd May 2008 Unable to get neutral because of sticking synchro-cones. Lubricated generously and all well Fitted pinion, selector gate and gear change rod Fitted new carrier bearings to differential unit and fitted to gearbox with new gaskets Adjusted crown wheel/pinion mesh with shims to give correct engagement backlash
Day 79 – Tuesday 6th May 2008 Transported engine from workshop to Wolseley’s garage Loaded engine onto small trolley for ease of moving around
Day 80 – Friday 9th May 2008 Fitted engine to sub-frame with new mountings
Day 81 – Saturday 10th May 2008 Fitted new brake cable quadrants to rear radius arms with new pins Fitted split pins to drive shaft couplings after torquing up Fitted suspension and drive shafts to engine and sub-frame
Day 82 – Monday 12th May 2008 Fitted radiator fan and fan belt
Day 83 – Tuesday 13th May 2008 Fitted radiator and hoses Painted bulkhead with final coat of stone-chip and sprayed with di-nitrol.
Day 84 – Thursday 15th May 2008 o PROBLEM – How do you fit the engine without a hoist? o ANSWER -Fit the car to the engine Put engine and sub-frame onto trolley Pushed engine and sub-frame assembly under car using the trolley Carefully lowered the car using 2 trolley jacks over engine and sub-frame
Day 85 – Friday 16th May 2008 Fitted rear wheels and supported car on ramps Removed rear body jig Supported front of floor on tyres and removed front jig Carefully jacked the sub-frame the last 2” and aligned bolt holes – alignment perfect despite much welding Fitted front off-side shock absorber and radius arm bracing arms with new rubbers
Day 86 – Thursday 22nd May 2008 Painted solenoid, mounting plate and distributor mounting Made up leather gasket to fit underneath brake and clutch master cylinders Removed masking paper from wings
Day 87 – Friday 23rd May 2008 Fitted new brake master cylinder and old clutch cylinder Fitted pressure valve to rear brake pipes Fitted new clutch slave cylinder Began making new front copper brake pipes Temporally fitted front wheels to support car
Day 88 – Tuesday 27th May 2008 Fitted new front brake pipes and off-side front brake shoes Fitted exhaust with new mounts and clamps
Day 89 – Wednesday 28th May 2008 Fitted nearside brake shoes. Made up gasket and fitted distributor carrier Fitted solenoid and bracket.
Day 90 – Tuesday 3rd June 2008 Fitted nearside front shock absorber Attached cables to handbrake Drilled out body trim clips Cleaned interior of car and rubbed down prior to painting Applied seam sealer to front bumper mountings, and to previous internal welds Started to mask up ready for interior spraying Painted bottom of front panel with tannic and rust treatment
Day 91 – Wednesday 4th June 2008 Finished masking ready for interior spraying Sprayed isolator to front and rear interior Sprayed stone-chip to bottom of front panel
Day 92 – Thursday 5th June 2008 Blew out and vacuumed interior Dry sanded isolator Sprayed interior in beige undercoat (2-pack) Sprayed interior with TARTAN RED – 90% complete
Day 93 – Friday 6th June 2008 Removed front grille from bonnet Removed chrome trim from doors These items to be taken to platers to re-chrome stripping, polishing and re-plating.
Monday 9th June 2008 Removed tyres from wheels (local tyre service) Took them for shot blasting and powder coating Took chrome work to platers for chrome stripping prior to polishing
Tuesday 10th June 2008 Collected wheels from blasters
Day 94 – Wednesday 11th June 2008 Stripped paint from bonnet back to bare metal Cleaned and repaired water channels under the door windows with fibreglass resin (heavily Corroded) Treated bonnet with tanic acid prior to painting.
Day 95 – Thursday 12th June 2008 Removed defective filler from off-side rear panel Bled brake system Fitted new tyres to wheels and then fitted them to car
Day 96 – Friday 13th June 2008 Continued to repair door water channels Welded repair patch to front edge of bonnet Small welding repairs to door channels
Day 97 – Monday 16th June 2008 Final resin repair to door channels Surplus resin used on boot floor to seal any porous welds Repaired corrosion in door bottoms after de-rusting and treating with tanic acid. Sprayed bonnet in primer
Day 98 – Tuesday 17th June 2008 Fitted engine stay with new brushes Rubbed down doors Rubbed down primer on bonnet
Day 99 – Thursday 19th June 2008 Dismantled starter Fitted new brushes and Bendix spring Cleaned, treated and painted starter in top coat Began fitting new wiring loom
Day 100 – Friday 20th June 2008 Fitted regulator box and fuse box, starter motor, flasher unit and speedometer
Day 101 – Friday 27th June 2008 Fitted clutch hydraulics
Day 102 – Saturday 28th June 2008 Cleaned an treated heater unit Bled clutch Fitted battery for circuit testing Fitted HT cable from battery to starter Work Done From 30th June to NowDay 103 – Monday 30th June 2008 Fitted new heater hose, horn and petrol line
Day 104 – Tuesday 1st July 2008 Fitted ignition switch, dip switch and light switch Painted heater unit in black
Day 105 - Wednesday 2nd July 2008 THE BIG DAY – Starting the engine Engine fired first – needed ignition advancing to run smoothly. Good oil pressure.
Day 106 – Thursday 3rd July 2008
Painted steering column
Carried on fitting wiring loom
Rubbed down interior
Painted heater pipe covers and petrol tank straps in primer
Day 107 – Friday 4th July 2008
Rubbed down interior and sprayed it again
Started fitting dashboard trim (lower)
Day 108 – Monday 7th July 2008
Fitted steering column
Day 109 – Tuesday 8th July 2008
Fitted sound proofing to the front bulkhead
Fitted ignition switch and window wiper switch
Day 110 – Wednesday 9th July 2008
Fitted heater
Fitted heater control
Fitted carpet to the front bulkhead
Fitted bonnet pull
Day 110 – Thursday 10th July 2008
Fitted headlight switch
Fitted petrol pump in boot for ease of access.
Fitted petrol tank and straps
Painted off-side boot floor support panel in primer
Day 111 – Friday 11th July 2008
Painted boot support panel in black
Cut out new sound proof material for bulkhead above parcel shelf
Day 112 – Monday 14th July 2008
Fitted offside boot support panel
Fitted window screen wiper motor and assembly
Ran engine to check water temperature – Adjusted carburettor float level
Fitted sound proofing to upper bulkhead
Started to fit trim to the upper dashboard and fitted the near-side screen vent
Day 113 – Tuesday 15th July 2008
Fitted near side heater pipe to vent
Day 114 – Friday 18th July 2008
Filled off-side rear quarter panel
Started to fill door bottoms
Filled depressions in bonnet
Removed rust from underneath of offside waist line trim and treated with tanic acid
Continued flatting filler
Removed number plate and badges from boot lid
Day 115 – Monday 21st July 2008
Rubbed down paint of boot lid
Continued to rub down body and doors
Day 116 – Wednesday 23rd July 2008
Continued to rub down doors
Flatted filler on bonnet and built up where needed
Day 117 – Thursday 24th July 2008
Continued to rub down and build up filler
Day 118 – Friday 25th July 2008
Continued flatting and filling
Day 119 – Tuesday 29th July 2008
Continued flatting and filling
Day 120 – Wednesday 30th July 2008
Continued flatting and filling
Day 121 – Thursday 31st July 2008
Continued flatting and filling
Day 122 – Friday 1st August 2008
Continued flatting and filling
Vacced out car for inspection by paint sprayer.
|
|
|