John's profileJohn's Space - Wolseley ...PhotosBlogListsMore Tools Help

Blog


    July 02

    Work Done From 21st January 2008 to 19th April 2008

    Day 31 - Monday 21st January 2008

          De-rusted engine bay

          Began repairing nearside wheel arch

          Cut off nearside sill top and cleaned out

          Began repairing near side inner sill brace

     

    Day 32 - Tuesday 22nd January 2008

          Painted engine bay with undercoat

          Treated nearside inner wheel arch with phosphoric acid

          Painted offside front panel with Hammerite

          Started welding nearside inner wheel arch

          Fitted nearside top shock absorber bracket

     

    Day 33 - Saturday 26th January 2008

          Continued to weld inner wheel arch on near side

          Finished welding near side inner sill brace

     

    Day 34 - Sunday 27th January 2008

          Repaired front end of nearside sill (welded new metal)

          Finished welding nearside inner wheel arch

          Repaired nearside top scuttle panel by welding new metal in

          Trial fitted nearside front wing – slight adjustment needed

     

    Day 35 - Tuesday 29th January 2008

          Finished welding nearside inner wheel arch

          Fitted nearside A panels

          Cut new nearside sill top to fit in 2 new parts

          Trial fitted nearside front wing – slight adjustment needed

     

    Day 36 - Thursday 31st January 2008

          Welded nearside top sill panel

          Welded new metal into base of radiator cowl

          Painted nearside inner wing arch and engine bay with primer

     

    Day 37 - Friday 1st February 2008

          Repaired top of nearside front panel

          Welded 2nd half of nearside top sill

          Reinforced engine steady bracket with fillets

     

    Day 38 - Sunday 3rd February 2008

          Painted inner wheel arches and engine bay in primer

          Repaired metal around gear lever hole

     

    Day 39 - Monday 4th February 2008

          Repaired front edge of door frame on drivers side

          Joined offside floor edge at front to inner wheel arch and painted with primer

     

    Day 40 - Tuesday 5th February 2008

          Fitted both front wings and started to weld into place

     

    Day 41 - Wednesday 6th February 2008

          Finished welding nearside front wing

     

    Day 42 - Friday 8th February 2008

          Started to cut away back panel under boot

          Removed supports for boot floor to expose corrosion

     

    Day 43 - Saturday 16th February 2008

          Supported car under the rear wheel arch so the rear body jig could be removed

          Cut off rest of back panel

     

    Day 44 – Monday 18th February 2008

          Blended off-side ‘A’ panel into sill step

          Cut out corroded metal from offside of boot bottom

          Blended in rear side panel into off-side sill panel

     

    Day 45 – Tuesday 19th February 2008

          Repaired off-side rear body panel at bottom

          Rebuilt corroded metal under off-side rear bumper

          Began repairing boot floor

    o       WELDER BROKE DOWN

     

    Friday 22nd February 2008

          Collected welders from repairers – dry joints in printed circuit board

     

    Day 46 – Sunday 24th February 2008

          Continued repairing boot floor (cut out corroded metal and welded in new)

     

    Day 47 – Monday 25th February 2008

          Welded rear end of off-side wheel arch

          Started repairing near-side boot floor (cut out corroded metal and welded in new)

     

    Day 48 – Tuesday 26th February 2008

          Finished welding near-side boot floor and wheel arch

          Wire brushed complete rear-end prior to fitting new rear panel

          New rear panel adjusted to fit body

          Fitted off-side end to rear panel and welded to wheel arch

     

    Day 49 – Friday 29th February 2008

          Fitted near-side end to rear panel and welded to wheel arch

          Drilled holes in rear-end of body to spot weld rear panel onto it

          Refitted rear jig in preparation for tilting the car 90˚ to de-rust and paint underside of car

     

    Day 50 – Sunday 2nd March 2008

          Tilted car 90˚ on jig to start working on the underside on Monday

     

    Day 51 – Monday 3rd March 2008

          Wire brushed nearside sill and floor area

          Treated with phosphoric acid

          Cut out corroded metal in rear nearside quarter panel

          Spot welded new metal to bottom and rear of nearside quarter panel

          Primed treated areas with hammerite

     

    Day 52 – Tuesday 4th march 2008

          Wire brushed nearside rear wheel arch

          Repaired rear shock absorber mounting

          Finished welding repair patches to nearside of boot floor

          Treated wheel arch with phosphoric acid

          Sprayed wheel arch with primer

     

    Day 53 – Thursday 6th March 2008

          Tilted car opposite way (offside up)

          Repaired shock absorber mounting

          Wire brushed floor and sill

          Cut out and repaired corroded metal

     

    Day 54 – Monday 10th March 2008

          Welded nearside front wind to front panel

          Wire brushed, de rusted and primed off-side rear wheel arch

          First coat of primer put on under floor area

     

    Day 55 – Tuesday 11th March 2008

          Repaired battery carrier, and offside rear seat panel

          Wire brushed and acid treated panel area under rear bumper

          Wire brushed and vacuumed out boot floor prior to acid treatment

          Acid treated boot floor

     

    Day 56 – Thursday 13th March 2008

          Wire brushed offside sill and under floor area

          Acid treated and repaired pin holes and sprayed with primer

     

    Day 57 – Friday 14th March 2008

          Sealed all welds on offside with seam sealer

          Repaired edge of front panel and joined to off-side of front wing

     

    Day 58 – Monday 24th March 2008

          Sprayed underside of car in red primer

          Seam sealed nearside

          Applied red primer to areas not previously sprayed

     

    Day 59 – Tuesday 25th March 2008

          Applied filler to repaired areas

          Sprayed underside with ‘stone-chip’

     

    Day 60 – Thursday 27th March 2008

          Painted boot floor with ‘chassis black

          Sprayed ‘chassis black’ on inside of the front wings and front panel

     

    Day 61 – Wednesday 2nd April 2008

          Applied second coat of ‘stone-chip’ to underside of car

          Started to reassemble rear subframe

     

    Day 62 – Friday 4th April 2008

          Pressed in new bushes to both radius arms

          Reamed plain bush in each arm to fit mounting spindle.

     

    Day 63 – Monday 7th April 2008

          Cleaned and painted rear suspension units and fitted to the rear sub-frame

          Fitted sub-frame Assembly to the car after treating sub-frame with “Di-nitrol”

          Fitted flexible brake hoses and rear shock absorber to nearside

     

    Day 64 – Tuesday 8th April 2008

          Fitted offside rear shock absorber and restored back plates

          Fitted hydraulic cylinders to back plates and brake shoes to the offside

          Sprayed steering rack in primer

     

    Day 65 – Wednesday 9th April 2008

          Made up and fitted copper brake pipe to rear brakes

     

    Day 66 – Thursday 10th April 2008

          Fitted steering rack

          Took gearbox to home workshop to dismantle

          Starting painting engine block

     

    Day 67 – Friday 11th April 2008

          Started to dismantle gearbox

          Took of differential unit and outer main shaft bearing

     

    Thursday 17th April 2008

          Collected riley elf cylinder head from being resurfaced (restored hornet cylinder head fitted to my Mum’s 69 Elf as this was distorted from overheating)

     

    Day 68 – Friday 18th April 2008

          Still working in home workshop

          Ground in valves

          Refitted Elf cylinder head to Hornet engine

          Finished painting engine block and cylinder head in white primer / orange undercoat / BMC engine green overcoat

     

     Day 69 – Saturday 19th April 2008

          Finished stripping gearbox (centre main shaft bearing in very poor state)

          Pressure cleaned gearbox housing and bell housing

          Masked off gearbox housing and bell housing and painted

          Mounted rear brake drum in Lathe ready for skimming

     

    Comments

    Please wait...
    Sorry, the comment you entered is too long. Please shorten it.
    You didn't enter anything. Please try again.
    Sorry, we can't add your comment right now. Please try again later.
    To add a comment, you need permission from your parent. Ask for permission
    Your parent has turned off comments.
    Sorry, we can't delete your comment right now. Please try again later.
    You've exceeded the maximum number of comments that can be left in one day. Please try again in 24 hours.
    Your account has had the ability to leave comments disabled because our systems indicate that you may be spamming other users. If you believe that your account has been disabled in error please contact Windows Live support.
    Complete the security check below to finish leaving your comment.
    The characters you type in the security check must match the characters in the picture or audio.

    To add a comment, sign in with your Windows Live ID (if you use Hotmail, Messenger, or Xbox LIVE, you have a Windows Live ID). Sign in


    Don't have a Windows Live ID? Sign up

    Trackbacks

    The trackback URL for this entry is:
    http://johnshakespeare.spaces.live.com/blog/cns!3E40C6CE4BA37BB0!2180.trak
    Weblogs that reference this entry
    • None